![]() ![]() ![]() Headquartered in Chesterfield, Missouri Mesa Logistics Group was established in 1981 and is a provider for FF&E and OS&E freight management, warehousing, and installations for different industries. According to data from the Airport Advisory Board, 12.5 million passengers came through the airport in the first six months of 2022, which is 33 more than during the same time in 2021. MLG president Jeff Brown said: “Although the Salt Lake City International Airport expansion has been challenging due to many factors, by keeping the lines of communication open, being transparent with all stakeholders, and finding creative solutions, the project has been a success.” To receive the many crates using overseas containers and truckloads, MLG applied and received clearance from TSA for the Mesa delivery drivers.Īs the cargo has to arrive from different locations, there has been a delay at the port, which prompted the company to make changes to the logistics process and delivery schedule. Inspired Networks was contracted by Big-D Construction and IES Communications for the Delivery Management of the Communication Systems outlined below.The project management team of MLG partnered with its sister company Mesa Moving and Storage – Salt Lake City to satisfy the needs to complete the work from Synergy Airport Logistics and the airport expansion project. The AOC was a CMAR construction contract awarded to Big-D Construction. The building will provide a command center, closed office space, open office space, conference rooms, and building support spaces. The AOC building is a one-story building of approximately 10,000 square feet. The project comprises of the repurposing of a former FedEx location which includes the renovation and expansion of the buildings into a single building for the AOC. The new Airport Operations Center (AOC) is one phase of the Airport Redevelopment Program. The Salt Lake City Corporation, through its Department of Airports (SLCDA), has embarked on a capital improvement program commonly known as the Airport Redevelopment Program (previously referred as the Terminal Redevelopment Program), which currently is expected to span 10 years and cost approximately $3.1 billion. The Salt Lake International Airport has been ranked as the 25th busiest airport in North America and the 85th busiest in the world. Salt Lake City International Airport (SLC) Airport Operations Center (AOC) – Salt Lake City, UT ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |